The customer adds two wall units and a corner carousel after you have quoted, the quartz tops are three weeks behind the units, and the flat-pack arrives a plinth short. Each of those is easier to deal with if the quote was built from a count of what you are fitting, gave anything that moves a service its own line, and said who is responsible for the worktop, the gas and the electrics. Where the customer is buying the kitchen, it should also say what happens if it arrives incomplete.

Survey the old kitchen against the new plan

Before pricing, lay the customer's plan (or the supplier's drawing) over the room as it is now, and note:

  • Where the sink, hob or cooker and dishwasher are now, and where they are going. Every move means new pipework or waste, or gas or electrical work, and adds cost.
  • Walls and floor. Check walls for square and the floor for level along the runs. A wall that is far out, or a floor that drops, means packing, scribing or levelling time.
  • What happens when the old units come off. Tiles and plaster behind old units can come away. Agree whether making good is yours, the plasterer's or the decorator's.
  • Appliances. List each one, whether it is integrated or freestanding, and whether it is new or the customer's existing one.
  • Access. Long worktops and tall units have to get through the door and round the stairs.

Take photos and measurements, and keep them with the quote. They are your record of what was there if a dispute comes up later.

Price what is fitted, not "the kitchen"

A single price for "fit kitchen" makes every change an argument. A count of what you are fitting lets you price a change by adding or removing a line. A structure like this works whatever your rates:

LineCount it byNotes
Strip-out and disposalPer kitchenSay whether waste removal is included
Base unitsNumber of unitsCorner and sink units can take longer; list them separately
Wall unitsNumber of unitsNote any that need fixing to stud or poor walls
Tall units and housingsNumber of unitsOven and fridge housings, larders
Panels, plinths, cornice and pelmetPer run or per kitchenEasily forgotten, and can take as long as the units
Laminate or timber worktopNumber of lengths, joints and cut-outsA sink or hob cut-out is a line of its own
AppliancesNumber fittedAllow for fitting door fronts on integrated appliances
Sink, tap and wastePer sinkConnecting on existing pipework, if it is not being moved
Moving servicesPer service movedPlumbing, waste, gas or electrics: see below
Making goodAllowancePlastering and tiling once the old units are off

Write each count on the quote. If the customer adds a wall unit or swaps a base unit for a corner carousel, you change one count, and the reason for the new total is plain.

Stone and quartz worktops are a second job

A laminate or timber worktop is cut and fitted with the units. If the worktop is stone, quartz or similar and is made to measure from a template taken on site, there will be a gap between fitting the units and fitting the tops, and there may be a return visit for the sink, tap and hob.

Ask the worktop supplier, before you quote, when they will template, what state they need the units in, and who connects the sink and hob afterwards. Then put a line on the quote for the return visit, and say who is supplying the worktop. If the customer is buying it direct, say that your price does not cover delays while it is made.

When the customer buys the kitchen

If the customer is buying the units from a retailer and you are fitting them, the quote should say:

  • That your price is for fitting the units on the customer's order, and you will check the delivery against the order before fitting day.
  • That missing or damaged parts are for the customer to chase with the retailer, and how a lost day or return visit will be charged.
  • Whether your price assumes flat-pack (assembly on site) or rigid units, as assembly adds time on site.
  • That you are responsible for your fitting, not for faults in the units or appliances themselves.

Ask to see the order or the plan when you quote, so your counts match what is coming. A count that matches the retailer's order is easy for the customer to check.

Moving services: price each one, and know who can do it or sign it off

Whatever moves gets its own line, priced for the route the pipe or cable will take. The rules below are for England and Wales. Scotland and Northern Ireland have their own building regulations, so check with the local building standards or building control office if you work there.

Gas. The Health and Safety Executive's gas FAQs, checked on 16 November 2026, say: "Anyone employed to work on gas appliances in domestic premises must be a Gas Safe registered engineer and competent in that area of gas work." The same page says that installing or reinstalling an appliance "is regarded as gas work and must be carried out by a Gas Safe registered engineer". Engineers' ID cards show which appliances they are qualified to work on. If you are not registered for cooking appliances, name the engineer who is on the quote, or say plainly that gas work is excluded and the customer must arrange it.

Electrics. The Building Regulations do not restrict who may carry out electrical work, but some of it has to be notified and certified. According to the Planning Portal's guidance on electrics, checked on 16 November 2026:

  • A complete new circuit, such as a new circuit for a cooker, is notifiable, as is a new or replacement consumer unit.
  • In England, a kitchen is not a "special location", so adding a socket or light to an existing circuit in a kitchen is not notifiable.
  • In Wales, kitchens are special locations, so alterations to existing circuits in a kitchen are notifiable (repairs and like-for-like replacements are not).
  • All electrical work, notifiable or not, should be designed, installed, inspected, tested and certificated to BS 7671.

Notifiable work has to be certified in one of three ways: by an electrician registered with a competent person scheme, who self-certifies, after which the customer should get a Building Regulations Compliance Certificate within 30 days; by a building control body; or, in England only, by a registered third-party certifier. The building control body or third-party certifier must be notified before work starts. If the electrics are not yours, name who is doing them on the quote. The consumer unit change guide covers the certificates the customer should get.

Plumbing and waste. Moving a sink means new supply and waste runs, and the waste needs a fall to where it connects. If you cannot see the route until the old units are out, put a stated allowance on the quote, with the rate it will be charged at, rather than guessing.

Walls, windows and doors. Some kitchen jobs come with knocking through or moving a wall. That has its own Building Regulations requirements, including structural support and fire safety, set out in the Planning Portal's internal walls guidance. Price and permit it as a separate piece of work.

Deposits, waste and asbestos

A kitchen you supply is a large outlay before you start, which is what the deposit is for. Deposits and payment schedules sets out stage payments and the cancellation rules when a job is agreed in the customer's home, including that on a supply-and-fit job the 14 days may not start until the goods arrive. A stage payment once the units are fixed, before the worktop is templated, gives you something visible to invoice against.

If you carry the strip-out waste yourself, you need to be an upper tier waste carrier in England (the other nations have their own registers), and a skip on the road needs a permit. Older kitchens can hide asbestos too: the Health and Safety Executive names kitchens as a place asbestos floor tiles are found, and says old tiles can be hidden under carpets. The bathroom refit guide covers all three in more detail, with links to the official guidance.

Where software helps

The return visit for a stone worktop is the part that goes missing. If the accepted quote becomes a job in your software, the template date and the return visit can be booked against it, and the stage invoice raised when the units are in, without retyping. Optional lines (a new extractor, under-cabinet lighting, a tiled splashback) let the customer choose without you redoing the quote. The software list can be filtered for tools that say they support optional quote lines, deposits and multi-day jobs.

Six changes to make to your kitchen quote template

  1. Add a line per unit type, per worktop length and cut-out, and per service moved.
  2. On every survey, mark where the sink, hob and dishwasher are now and where they are going, and photograph the walls and floor.
  3. For stone or quartz tops, ask the supplier when they template and put the return visit on the quote.
  4. Name who is doing the gas and the electrics, or exclude them in writing, and check whether any electrical work is notifiable.
  5. If the customer is buying the units, add the delivery check and missing parts wording.
  6. Add a making-good allowance for walls behind the old units.